South Africa · Online shop coming soon Get first access
Hippo BD5000 Oil & Fuel Polishing System — illustrative filtration concept, not to scale
Category illustration · confirm configuration
BD5000

Hippo · Industrial systems

Hippo BD5000 Oil & Fuel Polishing System

Twin-pot oil or fuel polishing system with suction and return hoses, lances and a filter-blockage pressure gauge. Electrical supply, element selection and the intended fluid are specified by quotation.

Selection note Oil or fuel duty must be confirmed for the complete supplied configuration and operating environment.

Product specifications

  • Order code: BD5000
  • Configuration: twin-pot polishing unit
  • Maximum flow: 10 L/min, depending on fluid viscosity
  • Brochure retention claim: up to 2 kg particulate and 0.7 litres water per element, dependent on the selected element and application; capacity is not a removal rate or a guaranteed final cleanliness
  • Pressure gauge indicates filter blockage
  • Electrical options: 240 V / 110 V / 415 V; confirm phase, frequency and site suitability
  • Supplied hose lengths: 3 m suction and return lines
  • Supplied lances: 1 m suction and discharge
  • Magnet option available
  • Water and particulate removal depend on the selected element. Confirm fluid, media, seals and exact cartridge reference before supply; no blanket Kleenoil cartridge interchangeability is claimed.
  • Pressure and temperature limits, fuel suitability, hazardous-area requirements, dimensions and mass: confirm before specification

Need a rating or dimension not shown here? Include your application in the enquiry so we can confirm the exact specification before supply.

Technical file

Download this product’s own specification summary, including listed variants and confirmation notes. Hippo range · manufacturer brochure specification basis · reviewed 8 October 2026 · not an installation manual

Open the downloaded file in a browser to print or save as PDF.
Quotation required

Request current availability, VAT-exclusive pricing and delivery for your required configuration and quantity.

01

Identify the exact item

Match the part reference, dimensions, material and intended application. Similar-looking items may not be interchangeable.

02

Confirm the specification

Check fluid compatibility, pressure and temperature ratings, connections and installation requirements where applicable.

03

Confirm local supply

Your quotation establishes the supplied configuration, quantity, price, lead time and delivery arrangements before an order is accepted.